Dashboard
The bidding command center β bid more, win more, spend less.
Greg β’ Estimator
G
π Internal build view β this dashboard (incl. Greg session capture & validation targets) is for
us building the tool. It is not what a contractor-client sees. Client-facing screens are Find,
Scope, Takeoff & Proposal.
Active validation bid
$52.5k
Melissa WF β reproducing Greg's number
Scope ledger
β%
Greg session 2026-07-09
Plan pages indexed
87
12 priority millwork sheets
Pricing inputs
Next
Slab $ Β· per-LF Β· markup
Greg session capture 2026-07-09 saved
π INTERNAL
Confirmed in room
| Plan topology (break / work / teller) | β |
| 7Γ Hafele grommets β hardware $, shop drills | β |
| CPU / forms / work bins β GC excluded | β |
| Cabinet takeoff: LF + boxes + HΓD from elev. | β |
| Material takeoff bar (M-04 ceiling, M-05 fluted) | β |
Wrap-up:
2026-07-09-session-3-greg-wrap-up.mdNext session β pricing block
| Dolomites slab $ Γ 2.25 β $13,228 | Q1βQ4 |
| Per-LF vs rule-of-three Β· MW + cabinets | Q2, Q7 |
| Markup % and material/labor split | Q3, Q8 |
| M-04 portal SF Β· M-05 panel count | Takeoff |
| Remaining hardware counts | Qty |
Workflow Melissa exemplar
β Plans ingested
PDF uploaded Β· sheet index built Β· G0.16 + A6/A7/A9 priority pages flagged
View plan index β
β‘ Scope review
Topology from floor plan Β· hardware vs holes Β· exclusions Β· sheet refs on every line
Open scope ledger β
β’ Takeoff β proposal
Footages first (17 LF teller, 3 slabs, 80 LF sill) Β· then Greg's pricing Β· export proposal
View takeoff roll-up β
Bid economics (target state)
Opportunities found
128
Passed fit score
71
Scope complete β bid
24
Won
6
New lever: Scope Review catches missed hardware & plan items before pricing β
Greg validated grommets, GC exclusions, and cabinet takeoff format on Melissa.
Live opportunities
DEMO FEED
β will pull from Texas ESBD + aggregators
AllMillwork
CaseworkCountertops
DFW
| Fit | Project | GC | Value | Due |
|---|
Cherry-pick a job β it drops into Pipeline β Leads. Fit score ranks by
profitability & winnability, so you only spend estimator hours on jobs worth bidding.
Real sources (Phase 6): Texas ESBD (no login Β· filter NAICS 337110 + millwork/casework Β· CSV export) Β·
govcb/Zabalist Β· ConstructConnect Β· Dallas ISD (Bonfire) Β· FWISD Β· CivCast Β· city/ISD portals.
This demo feed is a placeholder for that live scrape.
Constructability clashes across every sheet β GC emails & one-page briefs
Plan set β Wells Fargo / Melissa
π
wells-fargo-melissa-plans-2025-08-22.pdf
87 pages Β· click to open or drop PDF
Reading order (Greg's protocol): G0.16 finish schedule β floor plan topology β
elevation keys (A6) β millwork details + A7.11 hardware schedule β specialty (A9).
PDFs live in
prototype/plans/ β loaded in Edge/Chrome. Use Open PDF to replace; view persists in browser.Priority millwork sheets
Recent
Loading plan setβ¦
Click a priority sheet β specs Β· scope Β· concerns Β· materials below.
Job roll-up & all constructability concerns (click to expand)
Extracted quantities (from plans)
17 LF
Teller quartz (MW-4)
3
Dolomites slabs
80 LF
Sill MW-7 Γ 5"
~31 LF
PLAM counters BOH
Constructability concerns β
β catch before fab
Clashes logged on the sheet where they appear β RFI owner assigned so nothing rolls downhill unsigned.
Estimator legend Greg Β· spreadsheet-ready
β LF Β· shelves Β· base add-ons Β· specialty Β· cross-schedule
Schedule reconciliation completeness
Click legend row β jump plan pages Β· KB
bid-section-legend.md Β· cross-schedule-reconciliation.md Β· Greg spreadsheets incoming Β· ~5 missed items β melissa-missed-millwork-items.mdPlan topology read floor plan first
Hardware roll-up partial Greg β
Hardware β holes. Hafele/Doug Mockett on A7.11 = priced line items.
Pre-count from A9.00 + A7.11 Β· detail in KB
wells-fargo-melissa-hardware-qty-v1.mdScope ledger β
Exclusions (not in our $)
Greg sign-off
Check items as Greg confirms. Scope must reach 100% before final pricing lock.
Validation target$52,510
Job roll-up (Melissa)
Countertops
Cabinet runs
Supplier quotes
Greg rules
$30,982
Millwork
$8,300
Cabinets
$13,228
Countertops
$52,510
Bid total
Adjust slab $ on Countertops tab β demo total updates live. Greg's target: $52,510.
Scope β bid line trace
| Proposal line | Key scope | Sheets | Status |
|---|---|---|---|
| Millwork $30,982 | Teller, check desk, Brand Beacon, media wall, slat wall, open shelving, datum, ceiling, portal | A6.01β03, A7.04β13, A7.17, A9.00 | Scope β |
| Cabinets $8,300 | Break 125, work 122 casework, FOH printer | A6.02β03, A7.10β11 | BOH takeoff β |
| Countertops $13,228 | MW-4 quartz (teller, check desk, welcome), MW-2 PLAM, MW-7 sill | A9.00, A7.15, A7.17, A4.00 | Footages β |
FRISCO BROS
Architectural Millwork & Casework Β· Frisco, TX
Proposal Β· Project 1224-100
Sept 30, 2025
Valid 30 days
Sept 30, 2025
Valid 30 days
Wells Fargo β Melissa, TX Branch
Prepared for: C.A. Walker Construction
| Scope | Amount |
|---|---|
| Millwork β teller, check desk, Brand Beacon (A6.01), media wall, slat wall (A6.02), open shelving, datum, portal, install Trash enclosure on vestibule elev β excluded this job |
Sheets: A7.04β13, A9.00 Β· 58% scope confirmed
$30,982 |
| Cabinets β break room, work room, FOH storage Sheets: A6.02β03, A7.10β11 |
$8,300 |
| Countertops β Viatera Dolomites quartz, PLAM BOH, HIMACS sill 17 LF teller Β· 3 slabs Β· 80 LF sill Β· footages validated |
$13,228 |
| Total Bid | $52,510 |
Included: millwork hardware per A7.11 schedule (hinges, locks, slides, grommets where specified), blocking for datum/brackets, PLAM & quartz per MW schedule.
Excluded: BRG glass & deal trays, etched glass MW-14, WF vendor equipment & furniture, CPU/forms/work bins (GC), room door hardware (G0.10), field verify, paint/stain finishing.
Assumption: bid per plan dimensions β building not constructed at bid time.
Excluded: BRG glass & deal trays, etched glass MW-14, WF vendor equipment & furniture, CPU/forms/work bins (GC), room door hardware (G0.10), field verify, paint/stain finishing.
Assumption: bid per plan dimensions β building not constructed at bid time.
Proposal pulls from Scope Review + takeoff β every line traceable to a sheet.
Export PDF or email to GC from your BidForge outbox when pricing is reconciled.
Leads 3
Validating
Wells Fargo Melissa
Scope Β· pricing pending
Denton Fire Station #6
CORE spreadsheet Β· quote demo
Submitted
Medical Plaza β Reception MW$118k Β· due answer 7/18
Union Bank Branch Refresh$64k Β· awaiting GC
Won
Cherry-pick from Find Contracts β jobs land in Leads. When you win, assign a project manager β they own delegation and completion on task orders, prep decks, and purchase sheets (same takeoff record).
β
ποΈ After you win β one job record powers execution: task orders, prep decks, purchase sheet, cut list, shop drawings (GC submittal), and schedule.
All computed from the bid takeoff β no re-entry. Mock data today; Greg's numbers on server.
β
β
Project manager
Owns delegation, milestones, and job completion β task orders roll up here.
Milestones
Shop completeβ
Install on siteβ
Contractβ
Overview
Task orders
Prep decks
Purchase sheet
Cut list
Shop drawings
Job file
Schedule
Every constructability clash flagged on a plan sheet rolls up here. Use Email GC or a
One-page brief to explain the issue from your trade perspective β budget allowance,
fab hold, and schedule impact β before it rolls downhill unsigned.
π‘ Concept β when a new contractor gets the app, they self-onboard with a short interview
(the same idea as Greg's sessions, but self-serve). It seeds pricing defaults, preferred suppliers
(POC Β· email Β· catalog scan), and unlocks bookkeeping & tax strategy later.
Rule: keep it short β never tedious.
Contractor onboarding interview
β 5 min Β· 6 questionsTell us who you are and your numbers β then the tool tailors pricing to your shop.